← Home Again with Bob Vila

Season 8

26 episodes · 1997

  1. 1Craftsman Bungalow: Project Introduction

    01 Sep 1997

    A vintage Sears kit house is restored, but historic and sentimental elements are preserved.

  2. 2Craftsman Bungalow: Wiring, Plumbing and Plastering

    08 Sep 1997

    A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.

  3. 3Craftsman Bungalow: Reconditioning the Windows

    15 Sep 1997

    Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.

  4. 4Craftsman Bungalow: Interior Trim and Porch Framing

    22 Sep 1997

    Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.

  5. 5Craftsman Bungalow: Repairing the Front Facade

    29 Sep 1997

    Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.

  6. 6Craftsman Bungalow: Swimming Pool and Porch

    06 Oct 1997

    The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.

  7. 7Craftsman Bungalow: Working On the Pool

    13 Oct 1997

    Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.

  8. 8Craftsman Bungalow: Exterior Paint Preparation

    20 Oct 1997

    At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.

  9. 9Craftsman Bungalow: Floor Tile and Cabinet Installation

    27 Oct 1997

    The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.

  10. 10Craftsman Bungalow: Installing Custom Light Grids

    03 Nov 1997

    The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.

  11. 11Craftsman Bungalow: Installing Cabinets

    10 Nov 1997

    A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.

  12. 12Craftsman Bungalow: Hardwood Floor Repair and Refinishing

    17 Nov 1997

    Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.

  13. 13Craftsman Bungalow: House Tour

    24 Nov 1997

    Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.

  14. 14Dream Garage: Project Introduction

    01 Dec 1997

    Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.

  15. 15Dream Garage: Working On the Foundation

    08 Dec 1997

    Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.

  16. 16Dream Garage: More Foundation Work

    15 Dec 1997

    As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.

  17. 17Dream Garage: Framing the Garage

    22 Dec 1997

    A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.

  18. 18Dream Garage: Framing and Decking

    29 Dec 1997

    New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.

  19. 19Dream Garage: Insulating the Garage

    05 Jan 1998

    Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.

  20. 20Dream Garage: Exterior Trim and Siding

    12 Jan 1998

    Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.

  21. 21Dream Garage: Skylights and Metal Roofing

    19 Jan 1998

    Metal roofing is installed and drywall is put up around the skylights.

  22. 22Dream Garage: Installing Protective Features

    26 Jan 1998

    Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.

  23. 23Dream Garage: Installing a Staircase and Paneling

    02 Feb 1998

    A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.

  24. 24Dream Garage: Heating and Lighting

    09 Feb 1998

    A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.

  25. 25Dream Garage: Setting up the Workshop and Garage

    16 Feb 1998

    The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.

  26. 26Dream Garage: Barn Tourfinale

    23 Feb 1998

    Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.