  1. 1Accessible Home: Housing Project Introduced

    07 Sep 1998

    In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.

  2. 2Accessible Home: Framing and Shingling

    14 Sep 1998

    Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.

  3. 3Accessible Home: Installing Siding

    21 Sep 1998

    A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.

  4. 4Accessible Home: Insulation and Door Installation

    28 Sep 1998

    Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.

  5. 5Accessible Home: Designing for the Disabled

    28 Sep 1998

    Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.

  6. 6Accessible Home: Building the Railing System

    12 Oct 1998

    The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.

  7. 7Accessible Home: Building the Railing System Stairs

    19 Oct 1998

    Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.

  8. 8Accessible Home: Installing a Tankless Water Heater

    26 Oct 1998

    Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.

  9. 9Accessible Home: Shower Stall and Drywall

    02 Nov 1998

    Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.

  10. 10Accessible Home: Accessible Fixtures and Elevator

    09 Nov 1998

    The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.

  11. 11Accessible Home: Energy Efficiency Discussion

    16 Nov 1998

    The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.

  12. 12Accessible Home: Lockset Installation

    23 Nov 1998

    A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.

  13. 13Accessible Home: Accessible Unit Tour

    30 Nov 1998

    Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.

  14. 14Loft Conversion: Loft Conversion Initial Tour

    07 Dec 1998

    Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.

  15. 15Loft Conversion: Plumbing, Heating and the 'Big Dig'

    14 Dec 1998

    Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.

  16. 16Loft Conversion: Plastering the Loft

    21 Dec 1998

    Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.

  17. 17Loft Conversion: Elevating the Kitchen and Bedroom

    28 Dec 1998

    A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.

  18. 18Loft Conversion: Paint and Plate Glass Windows

    04 Jan 1999

    The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.

  19. 19Loft Conversion: Framing a Wall With Built-in Cabinets

    11 Jan 1999

    Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.

  20. 20Loft Conversion: Installing Plumbing Fixtures

    18 Jan 1999

    The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.

  21. 21Loft Conversion: Installing Stainless Steel Countertops

    25 Jan 1999

    Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.

  22. 22Loft Conversion: Drywall and Plastering Tips

    01 Feb 1999

    Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.

  23. 23Loft Conversion: Installing Track Lighting

    08 Feb 1999

    Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.

  24. 24Loft Conversion: Building a Closet System

    15 Feb 1999

    Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.

  25. 25Loft Conversion: Kitchen Work and Shutters

    22 Feb 1999

    Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.

  26. 26Loft Conversion: Loft Conversion Final Tourfinale

    01 Mar 1999

    A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.